Professional distribution · Morocco
Technical support

PROJECT WORKSHEETS / FIELD TOOLS

Intrusion zone schedule

Connect each opening or room to occupancy modes, the panel and the intended event response.

Complete worksheet

Draft in this tab only. Nothing is sent or saved to your account. Export before leaving. Do not enter passwords, access codes, personal information or sensitive plans.

Activating the interactive worksheet… The blank PDF remains available.

Project context

Use a non-confidential project name. Separate site observations from information still to verify.

Project context

E.g. Office A / refurbishment / before survey.

To complete

Visit, drawing revision, authorised photos or assumptions; do not attach documents here.

To complete

What needs to work, for which uses, and what is outside scope.

To complete

A zone and its use scenario

Separate physical detection, requested mode and intended response. A closed gate does not prove the alarm is armed.

Intrusion zone 1

E.g. Z-01 / stockroom door; use the drawing reference without describing confidential access.

To complete

For each mode, which groups move here? Record needs and exceptions for review, without real codes.

To complete

Opening or movement; existing or proposed contact/detector, exact reference and distinct role.

To complete

Animals, glazing, heat sources, obstacles, moving air and mounting. Record without assuming guaranteed immunity.

To complete

Input/partition reference to confirm, wired or radio, power and link supervision; no improvised wiring diagram.

To complete

Local warning, recipient role, transmission path and failure behavior. Distinguish notification from a response contract.

To complete

Opening, motion, tamper and link/power loss: expected results and authorised tests with the installer.

To complete

Resolve before selection

A filled field is not approval. Keep unknowns and decisions in the technical brief.

Resolve before selection

Record outstanding checks and the role responsible for them.

To complete

Marked plans, exact datasheets, diagrams and project requirements. No secrets or access keys.

To complete

Which role must confirm what, before which stage? Use a role, not a personal name.

To complete

Reading references

General principles and manufacturer examples, not approval of selected products. Verify each exact reference separately.

Teletek Electronics · PIRIN MW/AM — Motion detector functionsTeletek Electronics · Eclipse32 — Intruder alarm panel

Continue your preparation

Read the related guideUnderstand the systemOpen my projects

This worksheet does not create a project. An approved account can prepare a separate request in the professional workspace.