EatonSELECTION FIELDNOTES

Eaton: plan continuity, not just capacity.

What should happen when mains power fails? Keeping a network available, finishing a task and shutting down a server need different briefs. Identify priority equipment, the load to support and the time required before comparing UPS units.

View references

IT managers, integrators and buyers · workstations, networks and racks.

Concept IT room with a rack, generic rack-mounted UPS and tower form factor.
AI-generated conceptual illustration. Generic equipment, not associated with a brand model. Neither a real installation nor a technical plan.
8references in the loaded catalogue

Before you choose. Several catalogue titles begin with “Battery Runtimes”. That wording is neither a verified runtime curve nor a complete product specification. Keep the exact code and request its documentation; no backup duration is promised here.

Four roles in a continuity brief

Eaton distinguishes several UPS topologies and form factors. Preparation still starts with your use cases. This outline describes roles to document, not electrical connections to reproduce.

ROLES TO PLAN · PREPARATION OUTLINE

  1. Site supply

    Record voltage, phases, socket or terminal arrangement, protection and room constraints. A reference intended for another region is not an automatic equivalent.

  2. UPS and battery

    Check W and VA limits, topology and the batteries actually installed separately. Stored energy cannot be inferred from the VA figure alone.

  3. Priority loads

    Identify the outlets that actually feed essential equipment. Follow the whole chain: backing up a switch does not back up a provider handoff powered elsewhere.

  4. Shutdown and recovery

    Define who receives an alert and what shuts down, in what order. A USB or network connection does not prove shutdown software is installed, configured and tested.

Compare constraints, not just VA

QuestionCompareEvidence to request
Which electrical behaviour?Standby, line-interactive or double conversion: operating mode matters, not just the range name.Variant manual and load requirements, validated for the site.
For how long?Actual connected load, battery configuration and continuity or shutdown objective.Exact-model curve and test conditions. An isolated marketing figure is not enough.
How will it fit?Tower or rack, depth, weight, rails, clearance and input/output connectors.Dimensioned drawing, supplied items and access constraints; do not assume rails are included.
What can be controlled?Local indications, communication and any controllable outlet groups.Card, software, licences and functions confirmed for the reference. A port alone is not enough.

A useful survey before quotation

  1. One line per device

    Record quantity, model, supply, documented or measured consumption and its source. Distinguish an operating measurement from a stated maximum; leave unknowns visible rather than guessing.

  2. An explicit priority

    Classify what must continue, shut down cleanly or remain outside backup. Include network, storage and display dependencies. A remote camera may use a different supply from the protected server.

  3. A target, not a promise

    State the desired duration and shutdown procedure. Check the final choice against manufacturer evidence and the real installation; an ageing battery is not a new-battery test reference.

  4. An owner and a handover test

    Plan equipment access, alert recipients, battery records and an agreed test. Do not interrupt a live site just to complete this brief: testing requires an authorised procedure.

A small office, two priority levels

Fictional example: a team wants to retain networking and shut down a server cleanly. Loads and duration still need recording; no product is selected automatically.

  1. Draw the boundary

    Include the provider handoff, router and switch needed for service. A non-priority printer stays outside the proposed scope. The decision follows the need, not a spare socket.

  2. Separate continuity and shutdown

    Document the server shutdown sequence and dependencies. Do not assume an outlet can be switched separately: confirm that function on the chosen equipment.

  3. Verify, then record

    Compare the requirement with an exact reference and battery configuration. During authorised handover, record alerts, shutdown, recovery and observed results. A desired duration is not a measured result.

This scenario does not cover regulated safety supplies, critical medical equipment or electrical sizing. They require appropriate professional design and requirements.

Reference, region, version: keep the right evidence

Eaton runtime resources are organised by range and model. The linked resource is regional: if your suffix is absent, do not substitute a neighbouring model. Catalogue codes such as 5E700I, EL800USBFR and 9E10KI remain identifiers to match with their own manuals, not proof of sockets, runtime or included accessories.

The firmware portal separates UPS units, PDUs and communication cards. Record the full hardware designation before looking for a version; an available download does not validate an update on a production system. Add the manual, relevant curve, connections, software version and unresolved points to the brief. Files stay with the manufacturer.

Questions that prevent the wrong selection

Do two UPS units with the same VA run equally long?

No. VA is not a quantity of energy. You need the actual load, battery configuration and exact-model curve. Also check that watts stay within their own limit.

Does a surge-protected strip replace a UPS?

Surge protection alone does not provide battery backup. Check every outlet’s function: not every socket in an assembly is necessarily battery-backed.

Can I add a battery module to any reference?

No. Consider only configurations explicitly supported by the documentation. An additional module does not automatically raise the UPS power limit; compatibility, installation and duration still need checking.

Related guides and tools

From reading to a project brief

Discuss my selection
Sources, date and limits

Official documents are linked, not rehosted. Preparation advice is editorial; sources validate neither every catalogue reference nor a commercial partnership. Terms and variants still need checking.