Skip to content
Inovexia
Talk to an expert
Menu

Power · 7 min

Size backup power for connected infrastructure

Inventory critical loads, choose autonomy and plan maintenance before selecting a UPS.

A UPS is selected from the equipment that must remain available, its measured or documented load and the time required to continue or shut down safely.

01

Inventory critical loads

List switches, recorders, servers, controllers and essential interfaces. Use measured or manufacturer load data and include realistic growth margin.

02

Define the required outcome

Autonomy may bridge a short interruption, support a generator start or enable controlled shutdown. These objectives lead to different battery sizes and architectures.

03

Plan bypass, monitoring and maintenance

Document replacement periods, safe isolation, alarms and responsibility. Batteries are consumable components whose environment affects service life.

Q

Questions to resolve

  • Which systems must remain available?
  • For how long and for what purpose?
  • How will batteries, alarms and bypass be maintained?
+

Turn the guide into a project plan

Share your site plan and main priorities, and the Inovexia team will help coordinate the solutions, equipment and next steps.

Start my project

Your project

Turn your context into a clear project scope.

Describe the space, its users and the main priority. We will identify the right information and next steps with you.

Start my projectWhatsApp ↗